Renewable Energy in Portugal - Wind Power

Wind Power

From March 2007 to December 2010, wind power nameplate capacity grew from 1,874 to 3,937 MW in (excluding Madeira and Azores) Portugal. The major wind turbine manufacturers in the Portuguese market are Enercon, Vestas and Gamesa.

The 240 MW Alto Minho Wind Farm in the Viana do Castelo district became fully operational in November, 2008. At the time of completion it was Europe's largest on-shore wind farm.

Other major wind farms which are operating, or under construction, include: Arada-Montemuro Wind Farm (112 MW), Gardunha Wind Farm (106 MW), Pinhal Interior Wind Farm (144 MW) and Ventominho Wind Farm (240 MW).

Portugal combines wind and hydropower by using nighttime winds to pump water uphill and sending the water back through generators to produce power the next day.

Read more about this topic:  Renewable Energy In Portugal

Famous quotes containing the words wind and/or power:

    “An’ him no more to me nor me to him
    Than the wind goin’ over my hand.”
    —Charlotte Mew (1870–1928)

    “But, with whatever exception, it is still true that tradition characterizes the preaching of this country; that it comes out of the memory, and not out of the soul; that it aims at what is usual, and not at what is necessary and eternal; that thus historical Christianity destroys the power of preaching, by withdrawing it from the exploration of the moral nature of man; where the sublime is, where are the resources of astonishment and power.”
    —Ralph Waldo Emerson (1803–1882)