Wind Power
From March 2007 to December 2010, wind power nameplate capacity grew from 1,874 to 3,937 MW in (excluding Madeira and Azores) Portugal. The major wind turbine manufacturers in the Portuguese market are Enercon, Vestas and Gamesa.
The 240 MW Alto Minho Wind Farm in the Viana do Castelo district became fully operational in November, 2008. At the time of completion it was Europe's largest on-shore wind farm.
Other major wind farms which are operating, or under construction, include: Arada-Montemuro Wind Farm (112 MW), Gardunha Wind Farm (106 MW), Pinhal Interior Wind Farm (144 MW) and Ventominho Wind Farm (240 MW).
Portugal combines wind and hydropower by using nighttime winds to pump water uphill and sending the water back through generators to produce power the next day.
Read more about this topic: Renewable Energy In Portugal
Famous quotes containing the words wind and/or power:
“There is a time for building
And a time for living and for generation
And a time for the wind to break the loosened pane
And to shake the wainscot where the field-mouse trots
And to shake the tattered arras woven with a silent motto.”
—T.S. (Thomas Stearns)
“The terror of the atom age is not the violence of the new power but the speed of mans adjustment to itthe speed of his acceptance.”
—E.B. (Elwyn Brooks)