Wind Power
From March 2007 to December 2010, wind power nameplate capacity grew from 1,874 to 3,937 MW in (excluding Madeira and Azores) Portugal. The major wind turbine manufacturers in the Portuguese market are Enercon, Vestas and Gamesa.
The 240 MW Alto Minho Wind Farm in the Viana do Castelo district became fully operational in November, 2008. At the time of completion it was Europe's largest on-shore wind farm.
Other major wind farms which are operating, or under construction, include: Arada-Montemuro Wind Farm (112 MW), Gardunha Wind Farm (106 MW), Pinhal Interior Wind Farm (144 MW) and Ventominho Wind Farm (240 MW).
Portugal combines wind and hydropower by using nighttime winds to pump water uphill and sending the water back through generators to produce power the next day.
Read more about this topic: Renewable Energy In Portugal
Famous quotes containing the words wind and/or power:
“Over me the wind swirls.
I have stood on your portal
and I know
you are further than this,
still further on another cliff.”
—Hilda Doolittle (18861961)
“Communism is Soviet power plus the electrification of the whole country.”
—Vladimir Ilyich Lenin (18701924)