The first hydropower plant was built in 1904 by a local entrepreneur. It was located in a small town outside of Reykjavík and produced 9 kW of power. The first municipal hydroelectric plant was built in 1921, and it could produce 1 MW of power. This plant single-handedly quadrupled the amount of electricity in the country. The 1950s marked the next evolution in hydroelectric plants. Two plants were built on the Sog River, one in 1953 which produced 31 MW, and the other in 1959 which produced 26.4 MW. These two plants were the first built for industrial purposes and they were co-owned by the Icelandic government. This process continued in 1965 when the national power company, Landsvirkjun, was founded. It was owned by both the Icelandic government and the municipality of Reykjavík. In 1969, they built a 210 MW plant on the Þjórsá River that would supply the southeastern area of Iceland with electricity and run an aluminum smelting plant that could produce 33,000 tons of aluminum a year.

This trend continued and increases in the production of hydroelectric power are directly related to industrial development. In 2005, Landsvirkjun produced 7,143 GWh of electricity total of which 6,676 GWh or 93% was produced via hydroelectric power plants. Additionally 5,193 GWh or 72% was used for power intensive industries like aluminum smelting. In 2009 Iceland built its biggest hydroelectric project to date, a 690 MW hydroelectric plant and another aluminum smelter have been built — the Kárahnjúkar Hydropower Project; it is very controversial among environmentalists.

Other hydroelectric power stations in Iceland include: Blöndustöð (150 MW), Búrfellsstöð (270 MW), Hrauneyjafosstöð (210 MW), Laxárstöðvar (28 MW), Sigöldustöð (150 MW), Sogsstöðvar (89 MW), Sultartangastöð (120 MW), and Vatnsfellsstöð (90 MW).

Iceland is the first country in the world to create an economy generated through industries fueled by renewable energy, and there is still a large amount of untapped hydroelectric energy in Iceland. In 2002 it was estimated that Iceland only generated 17% of the total harnessable hydroelectric energy in the country. Iceland’s government believes another 30 TWh of hydropower every year could be produced, whilst taking into account the sources that must remain untapped for environmental reasons.

Read more about this topic:  Renewable Energy In Iceland