Relative Risk Reduction - Worked Example

Worked Example

Example 1: risk reduction Example 2: risk increase
Experimental group (E) Control group (C) Total (E) (C) Total
Events (E) EE = 15 CE = 100 115 EE = 75 CE = 100 175
Non-events (N) EN = 135 CN = 150 285 EN = 75 CN = 150 225
Total subjects (S) ES = EE + EN = 150 CS = CE + CN = 250 400 ES = 150 CS = 250 400
Event rate (ER) EER = EE / ES = 0.1, or 10% CER = CE / CS = 0.4, or 40% EER = 0.5 (50%) CER = 0.4 (40%)
Equation Variable Abbr. Example 1 Example 2
CER − EER < 0: absolute risk reduction ARR (−)0.3, or (−)30% N/A
> 0: absolute risk increase ARI N/A 0.1, or 10%
(CER − EER) / CER < 0: relative risk reduction RRR (−)0.75, or (−)75% N/A
> 0: relative risk increase RRI N/A 0.25, or 25%
1 / (CER − EER) < 0: number needed to treat NNT (−)3.33 N/A
> 0: number needed to harm NNH N/A 10
EER / CER relative risk RR 0.25 1.25
(EE / EN) / (CE / CN) odds ratio OR 0.167 1.5
EER − CER attributable risk AR (−)0.30, or (−)30% 0.1, or 10%
(RR − 1) / RR attributable risk percent ARP N/A 20%
1 − RR (or 1 − OR) preventive fraction PF 0.75, or 75% N/A

Read more about this topic:  Relative Risk Reduction

Famous quotes containing the word worked:

    It never worked for me.
    Something to do with violence
    A long way back, and wrong rewards,
    And arrogant eternity.
    Philip Larkin (1922–1986)

    An artist’s originality is balanced by a corresponding conservatism, a superstitiousness, about it; which might be boiled down to “What worked before will work again.”
    Nancy Hale (b. 1908)