Launch and Services
The VLocity trains began running at reduced speeds from December 2005, with 160 km/h services beginning on the Geelong, Ballarat, and Bendigo lines on 3 September 2006.
As well as reduced journey times, the new timetables also increased the frequency of services, with off-peak trains arriving up to once per hour. Additional trains, with varying consist lengths to suit demand, were also scheduled to operate during the peak, with one service on each line in the morning and evening peaks designated as the "flagship" service, which was scheduled to run at the journey time which had been promised.
Read more about this topic: Regional Fast Rail Project
Famous quotes containing the words launch and/or services:
“I had often stood on the banks of the Concord, watching the lapse of the current, an emblem of all progress, following the same law with the system, with time, and all that is made ... and at last I resolved to launch myself on its bosom and float whither it would bear me.”
—Henry David Thoreau (18171862)
“The community and family networks which helped sustain earlier generations have become scarcer for growing numbers of young parents. Those who lack links to these traditional sources of support are hard-pressed to find other resources, given the emphasis in our society on providing treatment services, rather than preventive services and support for health maintenance and well-being.”
—Bernice Weissbourd (20th century)