In addition to purchasing the team, Red Bull bought out AEG's $100 million share of the stadium, an after effect of lasting disagreements between the two corporations regarding their plans for the facility. Their differences prompted a significant delay in the early stages of the stadium's construction. After the naming rights of the soccer team were acquired, leading to the name Red Bull Park, Red Bull instituted a number of changes to the stadium's original design, which sparked tension between the Austrian-based energy drink company and AEG. Red Bull opted out of AEG's plan to construct a stage in the stadium for performances, one that would have increased profit margins for the group.

Construction of Red Bull Park began in late December 2007 with an undetermined 2009 completion date. The updated design was completed by Rossetti architects from Los Angeles and was built by New Jersey-based Hunter Roberts Construction Group, LLC. The new design featured a roof extending just past the field's touchlines with 60 feet (18 m) of the roof being translucent to allow for natural light. The first row of seating is approximately 21 feet (6.4 m) from the touchlines. The design is on par with those of soccer stadiums around the world. It looks similar to the Hypo-Arena in Klagenfurt, Austria in appearance. The stadium has 30 luxury suites and 1,000 premium seats.

Read more about this topic:  Red Bull Arena (New Jersey)

Famous quotes containing the words red, bull and/or design:

    We work harder than ever, and I cannot see the advantages in cooperative living.
    Lydia Arnold, U.S. commune supervisor (of the North American Phalanx, Red Bank, New Jersey, 1843- 1855)

    Not glad, lifeless tycoon, nor sorry feel
    For neither Bull nor Bear attends your way....
    Allen Tate (1899–1979)

    Delay always breeds danger; and to protract a great design is often to ruin it.
    Miguel De Cervantes (1547–1616)