Infrastructure
Since the conversion, the line uses standard gauge. The line is limited to 75 mph, and is not electrified. It has a maximum tonnage of 15 tonnes. The line has two tracks. There is a level crossing at Bramley railway station.
Read more about this topic: Reading To Basingstoke Line