The Final Design
Despite the Interior Department's rejection of the overall Rampart Dam project, the U.S. Army Corps of Engineers continued its engineering feasibility study on the project. That plan was completed on June 25, 1971, and it included most of the previous federal documents pertaining to the project, including the electricity market studies published by the Department of the Interior in 1965, the Fish and Wildlife study of 1964, and other studies about the economic feasibility of the project. A detailed description of potential construction methods and the overall plan for the project were included, as were reports about the site's geography and hydrology. In total, the report encompassed two volumes including more than 480 pages. Because the construction season at the site is only five months, the Corps of Engineers projected that several decades would be needed to build the dam and associated structures.
Read more about this topic: Rampart Dam
Famous quotes containing the words final and/or design:
“The train rounds, bending to a scream,
Taking the final level for the dive
Under the river”
—Hart Crane (18991932)
“You can make as good a design out of an American turkey as a Japanese out of his native stork.”
—For the State of Illinois, U.S. public relief program (1935-1943)