The Final Design

Despite the Interior Department's rejection of the overall Rampart Dam project, the U.S. Army Corps of Engineers continued its engineering feasibility study on the project. That plan was completed on June 25, 1971, and it included most of the previous federal documents pertaining to the project, including the electricity market studies published by the Department of the Interior in 1965, the Fish and Wildlife study of 1964, and other studies about the economic feasibility of the project. A detailed description of potential construction methods and the overall plan for the project were included, as were reports about the site's geography and hydrology. In total, the report encompassed two volumes including more than 480 pages. Because the construction season at the site is only five months, the Corps of Engineers projected that several decades would be needed to build the dam and associated structures.

Read more about this topic:  Rampart Dam

Famous quotes containing the words final and/or design:

    What the vast majority of American children needs is to stop being pampered, stop being indulged, stop being chauffeured, stop being catered to. In the final analysis it is not what you do for your children but what you have taught them to do for themselves that will make them successful human beings.
    Ann Landers (b. 1918)

    Nowadays the host does not admit you to his hearth, but has got the mason to build one for yourself somewhere in his alley, and hospitality is the art of keeping you at the greatest distance. There is as much secrecy about the cooking as if he had a design to poison you.
    Henry David Thoreau (1817–1862)