Construction of Michigan Stadium and Other Facilities
Aigler was also a leader in the construction of Michigan Stadium. In July 1926, Aigler was appointed to the Stadium Building Committee, which was empowered "to appoint the General Engineer for the building of the stadium and to let contracts for the excavation, placing of abutments, drainage, etc., so that work may proceed immediately." The stadium was built on time and within its budget, and Aigler presented a detailed report on construction costs to the Board in Control of Athletics; the total cost was $1,131,733.36.
He was also the chairman of the Board in Control of Athletics during the construction of Yost Fieldhouse and the Intramural Building.
Read more about this topic: Ralph W. Aigler
Famous quotes containing the words construction of, construction, stadium and/or facilities:
“No real vital character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the authors personality, developing by internal necessity as much as by external addition.”
—T.S. (Thomas Stearns)
“Striving toward a goal puts a more pleasing construction on our advance toward death.”
—Mason Cooley (b. 1927)
“In their eyes I have seen
the pin men of madness in marathon trim
race round the track of the stadium pupil.”
—Patricia K. Page (b. 1916)
“Marriage is good enough for the lower classes: they have facilities for desertion that are denied to us.”
—George Bernard Shaw (18561950)