Development
Design and construction began in September 2005 and the airport was opened in March 2008.
The airport project is a public-private joint venture between GMR Group, Malaysia Airports Holdings Berhad and both Government of Andhra Pradesh and Airports Authority of India (AAI). GMR Group holds 63% of the equity, MAHB 11%, while the Government of Andhra Pradesh and Airports Authority of India each hold 13%.
It is being developed in three phases, and when completed will provide infrastructure for 40 million passengers annually. The airport is expected to be the largest in terms of area and will provide world-class facilities. After the first phase of development, the airport will accommodate 10 million passengers a year. The total cost of the project is INR 24.7 Billion (US$560 million). The airport is being built on an area of 5,400 acres (2,200 ha). The airport was designed by the UK engineering design firm Arup, which also designed Dubai Terminal 3 and Beijing Terminal 3.
Read more about this topic: Rajiv Gandhi International Airport
Famous quotes containing the word development:
“As a final instance of the force of limitations in the development of concentration, I must mention that beautiful creature, Helen Keller, whom I have known for these many years. I am filled with wonder of her knowledge, acquired because shut out from all distraction. If I could have been deaf, dumb, and blind I also might have arrived at something.”
—Mark Twain [Samuel Langhorne Clemens] (18351910)
“The highest form of development is to govern ones self.”
—Zerelda G. Wallace (18171901)
“Other nations have tried to check ... the fulfillment of our manifest destiny to overspread the continent allotted by Providence for the free development of our yearly multiplying millions.”
—John Louis OSullivan (18131895)