Queen Elizabeth Class Aircraft Carrier - Construction

Construction

During a speech on 21 July 2004, Geoff Hoon announced a one-year delay to allow contractual and cost issues to be resolved. The building of the carriers was confirmed in December 2005. The building is being undertaken by four companies across seven shipyards, with final block integration and assembly at Rosyth:

  • BAE Systems Surface Ships – Govan (Lower Blocks 3 and 4), Scotstoun (aft island) and Portsmouth (Lower Blocks 2, 5 and forward island)
  • Babcock Marine – Rosyth (Sponsons, Mast and Centre Blocks 5 and 6) and Appledore (Lower Block 1)
  • A&P Group – Hebburn (Centre Block 3)
  • Cammell Laird – Birkenhead (Centre Blocks 2 and 4)

In December 2007, eight diesel engines and electricity generators, four for each ship were ordered from Wärtsilä. On 4 March 2008, contracts for the supply of 80,000 tonnes of steel were awarded to Corus Group, with an estimated value of £65 million. Other contracts included £3 million for fibre optic cable, over £1 million for reverse osmosis equipment to provide over 500 tonnes of fresh water daily, and £4 million for aviation fuel systems. On 3 April 2008 a contract for the manufacture of aircraft lifts (worth £13m) was awarded to MacTaggart Scott of Loanhead, Scotland.

In mid May 2008, the Treasury announced that it would be making available further funds on top of the regular defence budget, reportedly allowing the construction of the carriers to begin. This was followed, on 20 May 2008, by the government giving the "green light" for construction of the Queen Elizabeth class, stating that it was ready to sign the contracts for full production once the creation of the planned shipbuilding joint venture between BAE Systems and the VT Group had taken place. This joint venture, BVT Surface Fleet, became operational on 1 July 2008. VT Group later sold its share to BAE Systems which renamed the unit BAE Systems Surface Ships. It will undertake approximately forty per cent of the project workload.

On 1 September 2008, the MoD announced a £51 million package of important equipment contracts; £34 million for the highly mechanised weapons handling system for the two ships, £8 million for supply of uptake and down-take systems for both ships, £5 million for air traffic control software, £3 million for supply of pumps and associated systems engineering, and £1 million for emergency diesel generators. On 6 October 2008, it was announced that contracts had been placed for "the carriers' Rolls-Royce gas turbines, generators, motors, power distribution equipment, platform management systems, propellers, shafts, steering gear, rudders and stabilisers".

The construction of the two carriers involves more than 10,000 people from 90 companies, 7,000 of them in the six shipyards building the sections of the ships.

Read more about this topic:  Queen Elizabeth Class Aircraft Carrier

Famous quotes containing the word construction:

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)