Prospect High School (Illinois) - Additions

Additions

In 2002, a library was added. A new art wing was finished/proposed in 2003. The school was given a new cafeteria in 2004. As of 2007, work is being done to remove asbestos from the older parts of the building. In 2009, the gym was remodeled and a concession stand was added.

Read more about this topic:  Prospect High School (Illinois)