Process Area (CMMI) - Changes Made in Version 1.2

Changes Made in Version 1.2

Only changes made to the set of Process Areas are considered here. For more information about the changes made to Version 1.2, see the Version 1.2 Release Notes or for the definitive list of changes, take the CMMI Version 1.2 Upgrade Training.

  • The following Process Areas have been removed (all on Maturity Level 3):
    • Organisational Environment for Integration (OEI)
    • Integrated Teaming (IT)
    • Integrated Supplier Management (ISM)
  • The following additions have been made within existing Process Areas:
    • IPM – SG3 and SG4 were eliminated, new SG3 was added (as an IPPD addition)
    • OPD – SG2 was added (as an IPPD addition)
    • OPF – two SPs were extracted from the old SG3 and combined with two new SPs to create the new SG3
    • REQD – SP3.5 was renamed Validate Requirements
    • SAM – SP2.1 was eliminated, two new SPs added in SG2
    • TS – SP1.2 was incorporated into RD SP 3.1
    • VER – SP3.2 was renamed Analyze Verification Results

Read more about this topic:  Process Area (CMMI)

Famous quotes containing the word version:

    I should think that an ordinary copy of the King James version would have been good enough for those Congressmen.
    Calvin Coolidge (1872–1933)