Power Purchase Agreement - Contract Timeline - Commercial Operation

Commercial Operation

Before the seller can sell electricity to the buyer, the project must be fully tested and commissioned to ensure reliability and comply with established commercial practices. The commercial operation date is defined as the date after which all testing and commissioning has been completed and is the initiation date to which the seller can start producing electricity for sale (i.e. when the project has been substantially completed). The commercial operation date also specifies the period of operation, including an end date that is contractually agreed upon.

Read more about this topic:  Power Purchase Agreement, Contract Timeline

Famous quotes containing the words commercial and/or operation:

    I do seriously believe that if we can measure among the States the benefits resulting from the preservation of the Union, the rebellious States have the larger share. It destroyed an institution that was their destruction. It opened the way for a commercial life that, if they will only embrace it and face the light, means to them a development that shall rival the best attainments of the greatest of our States.
    Benjamin Harrison (1833–1901)

    Waiting for the race to become official, he began to feel as if he had as much effect on the final outcome of the operation as a single piece of a jumbo jigsaw puzzle has to its predetermined final design. Only the addition of the missing fragments of the puzzle would reveal if the picture was as he guessed it would be.
    Stanley Kubrick (b. 1928)