Port of Tilbury - Construction

Construction

The original docks of London, all built close to the City, were opened in stages by what was to become the East and West India Docks Company (E&WIDC) at the beginning of the 19th century. With the coming of the railways and increasing ship size, location close to the centre of London became less important than access to deep water, unrestricted sites and reduction in time spent travelling up the winding Thames. The Company had long been in competition with their rival, the London and St Katherine Dock Company (L&StKDC), and had been doing all it could to dominate it. The opening of the Royal Albert Dock by the L&StKDC, with its deepwater quayage, in 1880 had given access to the Thames at Gallions Reach, 11 miles (18 km) by river below London Bridge and downstream of the then principal London docks. The E&WIDC were forced to retaliate.

In 1882, an Act of Parliament allowed the latter to construct the docks at Tilbury; work began a fortnight later, and the first vessel to enter the docks was on 17 April 1886. This was the Glenfruin carrying the official party for the opening ceremony The opening of the dock took place at the beginning of the steamship era, and its location soon proved to be the correct one.

Read more about this topic:  Port Of Tilbury

Famous quotes containing the word construction:

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)