Port Elizabeth Airport - Infrastructure

Infrastructure

The airport has three runways. The main asphalt one 08/26 is 1,980m long, the second asphalt one 17/35 is 1,667m long and the third grass one is 1,160m long. There are also 13 aircraft parking bays on the apron and the terminal building measures 8,700 square metres. The modern terminal upgrade was completed in June 2004 allowing the airport to handle up to 2 million passengers a year.

Read more about this topic:  Port Elizabeth Airport