Technical Description
The two-train LNG plant will have capacity of 6.3 million tonne of LNG per annum. In addition to the gas from the Hides field, potentially gas could be sourced also from the Juha and Angore fields. The pre-FEED study was completed by the end of 2007. The decision to proceed with the Front End Engineering Design (FEED) will be made at the end of March or early April 2008. The FEED most likely would be prepared by KBR. The final investment decisions should be made in 2009. The plant is expected to be commissioned by 2013 and it is expected to cost US$9.5 billion, of which the development of the Hides, Juha and Angore gas fields together with a pipeline to the coast may cost US$5 billion, while the LNG plant could cost US$4.5 billion.
Read more about this topic: PNG Gas
Famous quotes containing the words technical and/or description:
“When you see something that is technically sweet, you go ahead and do it and you argue about what to do about it only after you have had your technical success. That is the way it was with the atomic bomb.”
—J. Robert Oppenheimer (19041967)
“Why does philosophy use concepts and why does faith use symbols if both try to express the same ultimate? The answer, of course, is that the relation to the ultimate is not the same in each case. The philosophical relation is in principle a detached description of the basic structure in which the ultimate manifests itself. The relation of faith is in principle an involved expression of concern about the meaning of the ultimate for the faithful.”
—Paul Tillich (18861965)