Technical Description
The two-train LNG plant will have capacity of 6.3 million tonne of LNG per annum. In addition to the gas from the Hides field, potentially gas could be sourced also from the Juha and Angore fields. The pre-FEED study was completed by the end of 2007. The decision to proceed with the Front End Engineering Design (FEED) will be made at the end of March or early April 2008. The FEED most likely would be prepared by KBR. The final investment decisions should be made in 2009. The plant is expected to be commissioned by 2013 and it is expected to cost US$9.5 billion, of which the development of the Hides, Juha and Angore gas fields together with a pipeline to the coast may cost US$5 billion, while the LNG plant could cost US$4.5 billion.
Read more about this topic: PNG Gas
Famous quotes containing the words technical and/or description:
“I rather think the cinema will die. Look at the energy being exerted to revive ityesterday it was color, today three dimensions. I dont give it forty years more. Witness the decline of conversation. Only the Irish have remained incomparable conversationalists, maybe because technical progress has passed them by.”
—Orson Welles (19151984)
“To give an accurate description of what has never occurred is not merely the proper occupation of the historian, but the inalienable privilege of any man of parts and culture.”
—Oscar Wilde (18541900)