Pinellas Trail - History

History

The Seaboard Air Line (SAL) and Atlantic Coast Line (ACL) railroads both served St. Petersburg and Clearwater for many years. They later joined CSX Transportation, who consolidated the existing infrastructure. This resulted in the abandonment of 34 miles worth of trackage, which was purchased by the Florida Department of Transportation. After voter approval, the County acquired the property, and began construction of the Pinellas Trail.

The first five miles (8 km) opened in December 1990, linking Taylor Park to Seminole Park. With the passage of the first Penny for Pinellas one-cent local option sales tax, plans were made to connect the construct additional segments along the railway corridor.

The Pinellas Trail is composed of the following railroad segments:

  • former SAL to the east of Tarpon Springs
  • former ACL from Tarpon Springs to Clearwater
  • former SAL into St. Petersburg

Read more about this topic:  Pinellas Trail

Famous quotes containing the word history:

    The history of all hitherto existing society is the history of class struggles.
    Karl Marx (1818–1883)

    All things are moral. That soul, which within us is a sentiment, outside of us is a law. We feel its inspiration; out there in history we can see its fatal strength.
    Ralph Waldo Emerson (1803–1882)

    Social history might be defined negatively as the history of a people with the politics left out.
    —G.M. (George Macaulay)