Persian Pipeline - Technical Description

Technical Description

The overall length of the pipeline would be 3,300 kilometres (2,100 mi) and the capacity would be 37–40 billion cubic meters of natural gas per year. The cost of Iranian section is estimated to be around $7 billion. This section will be 1,800 kilometres (1,100 mi) long and it would consist of 17 compressor stations. Each compressor station would have 4 turbo compressors. The cost of each station is expected to be around $100 million.

The Turkish section will be 660 kilometres (410 mi) long and cost about one billion euro. The pipeline would cross the difficult geographic environments, notably mountainous areas. It is expected to be operational by 2014.

Read more about this topic:  Persian Pipeline

Famous quotes containing the words technical and/or description:

    A technical objection is the first refuge of a scoundrel.
    Heywood Broun (1888–1939)

    Once a child has demonstrated his capacity for independent functioning in any area, his lapses into dependent behavior, even though temporary, make the mother feel that she is being taken advantage of....What only yesterday was a description of the child’s stage in life has become an indictment, a judgment.
    Elaine Heffner (20th century)