Overall Labor Effectiveness - Measuring Availability

Measuring Availability

There are many factors that influence workforce availability and therefore the potential output of equipment and the manufacturing plant. OLE can help manufacturers be sure that they have the person with the right skills available at the right time by enabling manufacturers to locate areas where providing and scheduling the right mix of employees can increase the number of productive hours. OLE also accounts for labor utilization. Understanding where downtime losses are coming from and the impact they have on production can reveal root causes — which can include machine downtime, material delays, or absenteeism — that delay a line startup.

Calculation: Availability = Time operators are working productively / Time scheduled
Example:
Two employees (workforce) are scheduled to work 8 hour (480 minutes) shifts.
The normal shift includes a scheduled 30 minute break.
The employees experiences 60 minutes of unscheduled downtime.
Scheduled Time = 960 min – 60 min break = 900 Min
Available Time = 900 min Scheduled – 120 min Unscheduled Downtime = 780 Min
Availability = 780 Avail Min / 900 Scheduled Min = 87%

Read more about this topic:  Overall Labor Effectiveness

Famous quotes containing the words measuring and/or availability:

    By measuring individual human worth, the novelist reveals the full enormity of the State’s crime when it sets out to crush that individuality.
    Ian McEwan (b. 1938)

    Since ... six weeks ago, there has been no day in which I have not had letters and visits on the subject of my nomination for the Presidency.... I say very little. I have in no instance encouraged any one to work to that end.... I have said the whole talk about me is on the score of availability. Let availability do the work then.
    Rutherford Birchard Hayes (1822–1893)