The Soetrich site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency, in 1930. Work by the contractor Degaine-Dubois began the same year, and the position became operational in 1935, at a cost of 86 million francs.
Soetrich stands just to the east of the Thionville-Luxembourg road. A military road and a 60 cm narrow-gauge railway link the entrance blocks to the rear supply areas. The railway continues through the ouvrage to the combat blocks. The combat and support areas are separated by only 125 meters (410 ft), and the total length of the main gallery is 625 meters (2,051 ft).