Ouvrage Saint-Roch - Description

Description

Ouvrage Saint-Roch was built between November 1930 and June 1932, starting with a contractor named Marting and finishing with Roussel. The cost was 12.7 million francs, of which the armament cost 2,128,000 francs

  • Block 1 (entry): one machine gun cloche and two machine gun embrasures.
  • Block 2 (observation): one machine gun/observation cloche.
  • Block 3 (infantry): one machine gun cloche and one grenade launcher cloche.
  • Block 4 (artillery): three twin machine gun cloches, two twin machine gun embrasures, one 75mm/29cal gun embrasure, and four 81mm mortar embrasures.

A fifth block on the crest of the mountain was proposed but not built, to house a GFM cloche. Two observation posts were associated with Saint-Roch, including Campoast, armed with one machine gun and twin automatic rifle positions.

Saint-Roch and an associated museum are open for visitation year-round. The facilities are operated by the Association de l'Armée des Alpes,

Read more about this topic:  Ouvrage Saint-Roch

Famous quotes containing the word description:

    He hath achieved a maid
    That paragons description and wild fame;
    One that excels the quirks of blazoning pens.
    William Shakespeare (1564–1616)

    God damnit, why must all those journalists be such sticklers for detail? Why, they’d hold you to an accurate description of the first time you ever made love, expecting you to remember the color of the room and the shape of the windows.
    Lyndon Baines Johnson (1908–1973)

    The next Augustan age will dawn on the other side of the Atlantic. There will, perhaps, be a Thucydides at Boston, a Xenophon at New York, and, in time, a Virgil at Mexico, and a Newton at Peru. At last, some curious traveller from Lima will visit England and give a description of the ruins of St. Paul’s, like the editions of Balbec and Palmyra.
    Horace Walpole (1717–1797)