Ouvrage Coume Annexe Sud - Design and Construction

Design and Construction

The site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency; Coume was approved for construction in May 1931. It was completed at a cost of 13 million francs. The petit ouvrage was to receive a separate entry block in a second phase, never carried out.

Read more about this topic:  Ouvrage Coume Annexe Sud

Famous quotes containing the words design and/or construction:

    We find that Good and Evil happen alike to all Men on this Side of the Grave; and as the principle Design of Tragedy is to raise Commiseration and Terror in the Minds of the Audience, we shall defeat this great End, if we always make Virtue and Innocence happy and successful.
    Joseph Addison (1672–1719)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)