Development drilling began in 1985 with a production well drilled from the B template. By the end of 2009 184 development wells had been completed, consisting of a mixture of production wells, observation wells, water injectors, gas injectors and cuttings injectors. Production was from deviated wells until 1992, when the first horizontal well was drilled. By June 1997, 28 horizontal wells had been completed, including three multilaterals. Horizontal drilling close to the oil-water contact was considered key to prolonging the plateau oil production period and achieving high recovery rates.

Read more about this topic:  Oseberg Oil Field

Famous quotes containing the words development and/or history:

    A defective voice will always preclude an artist from achieving the complete development of his art, however intelligent he may be.... The voice is an instrument which the artist must learn to use with suppleness and sureness, as if it were a limb.
    Sarah Bernhardt (1845–1923)

    The history of any nation follows an undulatory course. In the trough of the wave we find more or less complete anarchy; but the crest is not more or less complete Utopia, but only, at best, a tolerably humane, partially free and fairly just society that invariably carries within itself the seeds of its own decadence.
    Aldous Huxley (1894–1963)