Technical Description
The Ormen Lange field has been developed without using conventional offshore platforms. Instead, 24 subsea wellheads in four seabed templates on the ocean floor are connected directly by two 30 inches (762 mm) pipelines to an onshore process terminal at Nyhamna. After processing, the gas is exported by the world's second longest subsea gas pipeline - Langeled pipeline - approximately 1,200 kilometres (750 mi) from Nyhamna to Easington in England. The northern section of the export pipeline has a diameter of 42 inches (1,067 mm), and the section from Sleipner to Easington has a diameter of 44 inches (1,118 mm). The field produces 70 million cubic meters of natural gas per day.
Total cost is estimated to reach 66 billion Norwegian kroner (around US$12 billion) by the time of completion.
Read more about this topic: Ormen Lange (gas Field)
Famous quotes containing the words technical and/or description:
“In effect, to follow, not to force the public inclination; to give a direction, a form, a technical dress, and a specific sanction, to the general sense of the community, is the true end of legislature.”
—Edmund Burke (17291797)
“The Sage of Toronto ... spent several decades marveling at the numerous freedoms created by a global village instantly and effortlessly accessible to all. Villages, unlike towns, have always been ruled by conformism, isolation, petty surveillance, boredom and repetitive malicious gossip about the same families. Which is a precise enough description of the global spectacles present vulgarity.”
—Guy Debord (b. 1931)