History
This line was built as a part of Tokyo Line 9, linked with Chiyoda Line and Odawara Line, as described in Transport Policy Council Report No. 18 in 2000 from the Ministry of Transport (present Ministry of Land, Infrastructure and Transport (MILT)).
Odakyu started service on the first section, from Shin-Yurigaoka to Odakyū-Nagayama, on June 1, 1974. It expanded to Tama Center, the central station of Tama New Town, on April 23, 1975. This section was constructed by the national Japan Railway Construction Corporation, since renamed the Japan Railway Construction, Transport and Technology Agency (JRTT)), while Odakyu operated it and paid for the organization. On March 27, 1990, Odakyu opened Karakida station.
The line was constructed on double track, but Odakyu could not take a large part of the transport between Tokyo and Tama New Town. Delay of the quadrupling of the main Odawara Line due to long standing land acquisition conflicts prevented operating extra trains that were to connect the new town and the terminus of Shinjuku.
Rapid train service on the Tama Line began in 2000, and succeeded in increasing the number of passengers, shorting transit time.
Read more about this topic: Odakyu Tama Line
Famous quotes containing the word history:
“Racism is an ism to which everyone in the world today is exposed; for or against, we must take sides. And the history of the future will differ according to the decision which we make.”
—Ruth Benedict (18871948)
“A man acquainted with history may, in some respect, be said to have lived from the beginning of the world, and to have been making continual additions to his stock of knowledge in every century.”
—David Hume (17111776)
“... all big changes in human history have been arrived at slowly and through many compromises.”
—Eleanor Roosevelt (18841962)