Odakyu Tama Line - History

History

This line was built as a part of Tokyo Line 9, linked with Chiyoda Line and Odawara Line, as described in Transport Policy Council Report No. 18 in 2000 from the Ministry of Transport (present Ministry of Land, Infrastructure and Transport (MILT)).

Odakyu started service on the first section, from Shin-Yurigaoka to Odakyū-Nagayama, on June 1, 1974. It expanded to Tama Center, the central station of Tama New Town, on April 23, 1975. This section was constructed by the national Japan Railway Construction Corporation, since renamed the Japan Railway Construction, Transport and Technology Agency (JRTT)), while Odakyu operated it and paid for the organization. On March 27, 1990, Odakyu opened Karakida station.

The line was constructed on double track, but Odakyu could not take a large part of the transport between Tokyo and Tama New Town. Delay of the quadrupling of the main Odawara Line due to long standing land acquisition conflicts prevented operating extra trains that were to connect the new town and the terminus of Shinjuku.

Rapid train service on the Tama Line began in 2000, and succeeded in increasing the number of passengers, shorting transit time.

Read more about this topic:  Odakyu Tama Line

Famous quotes containing the word history:

    We may pretend that we’re basically moral people who make mistakes, but the whole of history proves otherwise.
    Terry Hands (b. 1941)

    Indeed, the Englishman’s history of New England commences only when it ceases to be New France.
    Henry David Thoreau (1817–1862)

    The history of all hitherto existing society is the history of class struggles.
    Karl Marx (1818–1883)