Nuclear Power in Spain - Fuel Cycle

Fuel Cycle

ENUSA is a company in Spain with various holdings in uranium mining. A Uranium mine in Saelices el Chico was operated for some time, but is now decommissioned and Spain imports all of its Uranium fuel.

State owned Empresa Nacional de Residuos Radiactivos SA was established in 1984 and is the responsible outfit for radioactive waste disposal and decommissioning. There is a temporary dry storage facility at the Trillo Nuclear Power Plant, and research for a long term geological repository won't commence until 2010.

Read more about this topic:  Nuclear Power In Spain

Famous quotes containing the words fuel and/or cycle:

    I had an old axe which nobody claimed, with which by spells in winter days, on the sunny side of the house, I played about the stumps which I had got out of my bean-field. As my driver prophesied when I was plowing, they warmed me twice,—once while I was splitting them, and again when they were on the fire, so that no fuel could give out more heat. As for the axe,... if it was dull, it was at least hung true.
    Henry David Thoreau (1817–1862)

    The cycle of the machine is now coming to an end. Man has learned much in the hard discipline and the shrewd, unflinching grasp of practical possibilities that the machine has provided in the last three centuries: but we can no more continue to live in the world of the machine than we could live successfully on the barren surface of the moon.
    Lewis Mumford (1895–1990)