Norwegian Sky - Concept and Construction

Concept and Construction

The ship that eventually became known as Norwegian Sky was originally ordered in December 1993 by Costa Cruises from the Bremer Vulkan shipyard in Bremen, Germany as the second in a pair of sister ships. The first sister, Costa Victoria, was delivered in July 1996. Construction of the second sister, Costa Olympia, had started several months before, but by July 1996 Bremer Vulkan was experiencing severe financial difficulties, and work on the Costa Olympia was suspended when only 35% of the ship was completed. On 1996-10-06 the incomplete hull was floated out of drydock and subsequently laid up.

Costa Cruises decided not to purchase the unfinished ship, and the Costa Olympia remained laid up at Bremer Vulkan until December 1997, when Norwegian Cruise Line (NCL) purchased her. The Costa Olympia was redesigned as the Norwegian Sky by Tillberg Design (who had also been responsible for her original planned design as Costa Olympia). On 1998-03-08 the ship was towed to Lloyd Werft in Bremerhaven, Germany where her construction was completed. In 1998 NCL ordered two additional ships of the Norwegian Sky design. The first of these was delivered in 2001 as the Norwegian Sun while the order for the second one was cancelled. The Norwegian Sky underwent her sea trials on 1999-06-17, and was delivered to NCL on 1999-06-28.

Read more about this topic:  Norwegian Sky

Famous quotes containing the words concept and/or construction:

    Jesus abolished the very concept of “guilt”Mhe denied any cleavage between God and man. He lived this unity of God and man as his “glad tidings” ... and not as a prerogative!
    Friedrich Nietzsche (1844–1900)

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)