North Carolina International Port - Proposed Scope and Infrastructure Investment

Proposed Scope and Infrastructure Investment

Conceptual designs for the North Carolina International Terminal called for a high-density, automated container terminal capable of serving 12,000-TEU vessels with at least a 50-foot draft (the existing navigation channel serving the Port of Wilmington in the Wilmington Harbor has a dredge depth of 42 (+/-) feet). Development of the North Carolina International Terminal on the existing footprint could result in a terminal that could handle as many as 2-3 million TEUs a year, which is equivalent to the capacity currently handled by container terminals such as Charleston and Savannah. Construction cost projections as of June 2010 were approximately $4.4 billion (escalated).

Development would have required additional transportation infrastructure expenditures to accommodate the movement of cargo to and from the terminal by both road and rail. Currently, both road and rail access to the proposed North Carolina International Terminal site are limited and would have required substantial improvement to accommodate the expected cargo volumes and to alleviate additional traffic on local roadways.

Read more about this topic:  North Carolina International Port

Famous quotes containing the words proposed, scope and/or investment:

    It has been proposed that the town should adopt for its coat of arms a field verdant, with the Concord circling nine times round.
    Henry David Thoreau (1817–1862)

    Revolutions are notorious for allowing even non- participants—even women!—new scope for telling the truth since they are themselves such massive moments of truth, moments of such massive participation.
    Selma James (b. 1930)

    There is something fascinating about science. One gets such wholesale returns of conjecture out of such a trifling investment of fact.
    Mark Twain [Samuel Langhorne Clemens] (1835–1910)