Nevada Solar One - History

History

In 2006, located 30 miles north of Tucson, Arizona Public Service's Saguaro Solar Facility opened, with 1 MW of electrical generation capacity. Nevada Solar One went online for commercial use on June 27, 2007. It use similar technology and was constructed over a period of 16 months. The total project site is approximately 400 acres (0.6 mi² / 1.6 km²), while the solar collectors cover 300 acres (1.2 km2).

Read more about this topic:  Nevada Solar One

Famous quotes containing the word history:

    I am ashamed to see what a shallow village tale our so-called History is. How many times must we say Rome, and Paris, and Constantinople! What does Rome know of rat and lizard? What are Olympiads and Consulates to these neighboring systems of being? Nay, what food or experience or succor have they for the Esquimaux seal-hunter, or the Kanaka in his canoe, for the fisherman, the stevedore, the porter?
    Ralph Waldo Emerson (1803–1882)

    The history of the world is none other than the progress of the consciousness of freedom.
    Georg Wilhelm Friedrich Hegel (1770–1831)

    A country grows in history not only because of the heroism of its troops on the field of battle, it grows also when it turns to justice and to right for the conservation of its interests.
    Aristide Briand (1862–1932)