Power Generation
The hydroelectric plant has a power generation capacity of 815.6 MW with 8 units (1x110 MW+7x100.8 MW). First unit was commissioned on 7 March 1978 and 8th unit on 24 December 1985. The right canal plant has a power generation capacity of 90 MW with 3 units of 30 MW each. The left canal plant has a power generation capacity of 60 MW with 2 units of 30 MW each. Tail pond is under advanced stage of construction to put to use the pumped storage features of 7x100.8 MW units.
Read more about this topic: Nagarjuna Sagar Dam
Famous quotes containing the words power and/or generation:
“The spider-mind acquires a faculty of memory, and, with it, a singular skill of analysis and synthesis, taking apart and putting together in different relations the meshes of its trap. Man had in the beginning no power of analysis or synthesis approaching that of the spider, or even of the honey-bee; but he had acute sensibility to the higher forces.”
—Henry Brooks Adams (18381918)
“One generation abandons the enterprises of another like stranded vessels.”
—Henry David Thoreau (18171862)