Nabucco Pipeline - Construction

Construction

The Nabucco project is included in the EU Trans-European Energy Network programme and a feasibility study for the Nabucco pipeline has been performed under an EU project grant. The front end engineering and design (FEED) services of the pipeline, including the overall management of the local FEED contractors, the review of the technical feasibility study, route confirmation, preparation of the design basis, hydraulic studies, overall SCADA and telecommunications, GIS and preparation of tender packages for the next phase, was managed by UK-based consultancy Penspen. Starting from 14 December 2011, WorleyParsons was appointed as on owner's engineer.

According to Reinhard Mitschek, managing director of Nabucco Gas Pipeline International GmbH, construction of the pipeline is scheduled begin in 2013 and it would be operational by 2017.

Read more about this topic:  Nabucco Pipeline

Famous quotes containing the word construction:

    When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.
    Edmund Burke (1729–1797)

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)