Locomotive manufacturing during this period was hard, heavy, dangerous work. It proceeded according to numerous 'rules of thumb' developed by the master mechanic over the years. Innovations were introduced slowly. There were continuous efforts to reduce costs, and increase performance. Weight reduction was not desirable, as weight-on-drivers contributed directly to tractive effort. Locomotive frames were usually riveted, built-up construction, of wrought iron and later, steel.

According to White, experience at the Norris Locomotive Works showed that a team of 14 men could build a locomotive in 15 days. This was assuming the parts were on hand. A locomotive is a carefully integrated collection of a large number of specialty parts.

Read more about this topic:  Mount Savage Locomotive Works

Famous quotes containing the word procedures:

    Young children learn in a different manner from that of older children and adults, yet we can teach them many things if we adapt our materials and mode of instruction to their level of ability. But we miseducate young children when we assume that their learning abilities are comparable to those of older children and that they can be taught with materials and with the same instructional procedures appropriate to school-age children.
    David Elkind (20th century)