Morgan Iron Works - Production Summary

Production Summary

The following tables list marine engines known to have been built by T. F. Secor & Co. and the Morgan Iron Works to 1867. The lists, with the exception of the warship list, are probably incomplete. Marine engines built under Roach management are not listed as Roach had a second marine engine facility at Chester, Pennsylvania and records generally do not distinguish between the output of the two plants.

Where a ship had more than one name, the names are listed in chronological sequence, with two digits representing the last two digits of the year the rename took place where known. Ship names in small type preceded or followed by an arrow (← →) indicate that the engine for this vessel was used in another ship. The abbreviation "n/a" in the following tables means "not available" (i.e. not known).

Read more about this topic:  Morgan Iron Works

Famous quotes containing the words production and/or summary:

    The growing of food and the growing of children are both vital to the family’s survival.... Who would dare make the judgment that holding your youngest baby on your lap is less important than weeding a few more yards in the maize field? Yet this is the judgment our society makes constantly. Production of autos, canned soup, advertising copy is important. Housework—cleaning, feeding, and caring—is unimportant.
    Debbie Taylor (20th century)

    Product of a myriad various minds and contending tongues, compact of obscure and minute association, a language has its own abundant and often recondite laws, in the habitual and summary recognition of which scholarship consists.
    Walter Pater (1839–1894)