Mizoram - Energy Sector

Energy Sector

Mizoram is not self-sufficient in power. Despite having a potential of 4500 MW in hydropower, it is yet to be developed. Some communities use solar power – at least for light. There are 22 diesel power stations for power backup (26.14 MW)and 9 mini/micro hydel (hydroelectric) plants producing 8.25 MW. As per the 16th Electric Power Survey of India under CEA, Government of India, the restricted peak load demand of the state during the 2002–2003 year is 102 MW. Serlui B Dam, a 12 MW hydel project near Kolasib is currently being used by the State Government. Tuirial Dam, a 64 MW capacity hydel dam is currently under construction and is expected to be completed by 2013. An MoU has been signed for Bairabi Dam and Tlawng Dam by Government of India on 10 August 2012.

Read more about this topic:  Mizoram

Famous quotes containing the word energy:

    Children are intensely invested in getting their way. They will devote more emotional and intellectual energy to winning arguments than parents ever will, and are almost always better rested.
    Jean Callahan (20th century)