Milwr Tunnel - Today

Today

The Milwr Tunnel was purchased by Welsh Water in 1992 in order to supply water to industry; it still discharges an average of 23 million gallons of water per day. The tunnel is currently maintained by United Utilities. Although a complete trip through to the portal is no longer possible due to roof falls and consequent flooding in the lower sections, occasional access is permitted to cavers and mine explorers, who have mapped many of the old workings. Some abandoned mining equipment and several miles of the tunnel's railway system remain in-situ.

Read more about this topic:  Milwr Tunnel

Famous quotes containing the word today:

    What we’re saying today is that you’re either part of the solution or you’re part of the problem.
    Eldridge Cleaver (b. 1935)

    I remember a very important lesson that my father gave me when I was twelve or thirteen. He said, “You know, today I welded a perfect seam and I signed my name to it.” And I said, “But, Daddy, no one’s going to see it!” And he said, “Yeah, but I know it’s there.” So when I was working in kitchens, I did good work.
    Toni Morrison (b. 1931)

    It is not their brotherly love but the impotence of their brotherly love that keeps the Christians of today from—burning us.
    Friedrich Nietzsche (1844–1900)