Milwr Tunnel - Construction

Construction

The first phase of the tunnel was driven by the Holywell-Halkyn Mining and Tunnel Company, a consortium of local mines, under the supervision of engineer Nathaniel R. Griffith of Wrexham. The Company was formed in 1896, its Secretary and Manager being John Philip Jones, and its directors listed as the Hon. C. T. Parker, H. A. Cope, J. B. Feilding, T. Snape, John Brock, Henry Taylor, and Eustace Carey. The mines involved hoped that the construction of the tunnel, by allowing them to work rich seams of ore at depth without incurring high pumping costs, would enable them to meet their low-cost international competition head-on.

Tunnelling was commenced in July 1897 at Boot End, Bagillt, from a point 9 feet below high water mark on the Dee foreshore, where self-acting flood doors were fitted. It was driven at a gradient of 1:1000, initially brick lined where it passed through coal measures and shale, and unlined after the first 1.5 miles where it passed through chert and limestone, successively reaching the Pen-yr-Hwylfa, Dolphin, Drill, Coronation and Caeau veins; a branch tunnel accessed the Old Milwr vein. In 1908 driving stopped 2 miles from the portal at Caeau Mine, the limit of the company's mineral rights, at which time the tunnel was draining some 1.7 million gallons of water per day through the drainage channel cut in its floor.

Read more about this topic:  Milwr Tunnel

Famous quotes containing the word construction:

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)