Rail Track Costings (at 2004 Prices)
Priced per kilometre
- Normal one track (no via-ducts nor bridges) = 5 to 10 M€
- Bridges and Viaducts priced per kilometre = 30 to 50 M€ (one of two tracks is 0.6 of total cost)
- Tunnels for 21st century needs at 270 km/h mono-tube or one track per tube 100m square 30M€ to 50M€
- Tunnels that exceed 500m to 1 km, special security furnishings, 45M€ to 75M€ (averaged to 1 km for 3/4/7/10 km tunnel)
- TER Typical 21st century costings for regional rail transport are also available here.
Read more about this topic: Midland Railway Action Group
Famous quotes containing the words rail and/or track:
“For this is the mark of a wise and upright man, not to rail against the gods in misfortune.”
—Aeschylus (525456 B.C.)
“If you are ambitious of climbing up to the difficult, and in a manner inaccessible, summit of the Temple of Fame, your surest way is to leave on one hand the narrow path of Poetry, and follow the narrower track of Knight-Errantry, which in a trice may raise you to an imperial throne.”
—Miguel De Cervantes (15471616)