Midland Counties Railway - Construction

Construction

Construction work on the whole line began immediately. Most easy was the section from Derby to Nottingham, which was proceeded with a quickly as possible, to gain some revenue. The only obstacle was the Derby Canal which would need to be diverted at Borrowash, the canal owners asking £2 for every hour that it was closed. However quick action allowed the work to be completed, when a drought fortuitously occurred, closing the canal. Initially the railway ran into a temporary platform at Derby, but at Nottingham a magnificent terminus had been built in Carrington Street.

The section to Leicester had three main obstacles, the first being the crossing of the Trent. This was done by means of an elegant three arched bridge built by the Butterley Company. Immediately following this was Redhill Tunnel, provided with elegant castellated portals to placate the local landowner. The bridge was replaced with the present girder bridge in 1900 when the line was quadrupled, and a second bore was provided for the tunnel with identical portals. Finally a substantial cutting was needed at Sutton Bonington.

While the Derby-Nottingham tracks had been supported on stone blocks, the section to Rugby used kyanised timber sleepers. At Leicester there was another magnificent station in Campbell Street, originally planned as a terminus on a spur from the main line. However, it was built as a loop with a single long platform next to the through running lines. It was replaced by the present London Road station in 1892.

Progress to Rugby was hampered by wet weather and the need for several long cuttings and embankments. There were two tunnels, at Knighton and near Ullesthorpe and a bridge over the River Avon and the Oxford Canal at Rugby. This last was not completed in time for the opening and, for seven weeks, passengers had to alight at a temporary platform, to be taken by road into Rugby.

The steepest gradient was 1 in 330, with the largest earthworks being on the Rugby line at the Leire cutting and embankment. There were 148 bridges in all, and three tunnels. The rails were double headed in 15 foot lengths at 77 lb. per yard at a gauge throughout of 4 foot 8½ inches. These were laid either on gritstone blocks from Cromford, laid diagonally, or on embankments, timber sleepers of oak or kyanised larch. For a length near Rugby, Evans's dove-tailed bridge rails of 57 lb per yard, were tried, mounted on longitudinal Memel fir timbers with pine cross sleepers.

Read more about this topic:  Midland Counties Railway

Famous quotes containing the word construction:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)