The Rise and Fall of Michelin House
On 20 January 1911, Michelin House was officially opened. The building offered everything the motorist of the time required. Fitting bays at the front of the building allowed motorist to have their tyres speedily changed by Michelin fitters from the stock of over 30,000 stored in the basement. Tyres were brought up on a lift and rolled to the front of the building along the purposely sloped floor. To the left of the front recipient, a ‘Touring Office’ provided maps and writing implements for the keen motorist to plan his or her journey.
Within a year of opening, work started on an extension to the building to provide additional office space and included a second floor. The extension was built along the Lucan Place side of the building. A further extension was built in 1922, ten years after the first. Located where a garage had stood, it reached three floors.
In 1927, Michelin built a factory in Stoke-on-Trent using the firm of Peter Lind & Company of London. The factory started producing the first British made Michelin tyres and in 1930, the company moved their head office to Stoke-on-Trent. Michelin continued to use the basement and the ground floor of the building, but over two-thirds were left empty. Between 1933 and 1940, the upper storeys were let as a furniture warehouse, a workshop and offices for the Air Ministry.
In 1940, because of the risk of bombing, Michelin removed the three stained glass windows. They were carefully packed into wooden crates and sent to the Stoke-on-Trent factory for safe keeping. After the war, Michelin returned its headquarters to London. The reduced staff meant only the front original part of the building was occupied, while the rest of the building was leased. In 1950, a long term lease was signed by a new tenant which consisted of the space created in the 1912 and 1922 extensions. In 1952, an extension was added for the tenant. A steel frame construction, it extended part of the second floor and added a third floor along the Lucan Place side of the building.
In 1960, Michelin and their tenant began a modernisation programme for the interior of the building. The programme went along with the general taste of the time. Although the work concentrated on the interior of the building, the possibility of update the exterior of the building with a cement rendered facade was one option considered. The modernisation involved splitting up the open plan office and the heavy use of wood panelling.
On 15 April 1969 the original front section of the Michelin Building was given a Grade II listing. Despite this, outline planning permission was granted to demolish all but the listed part and build a ten storey office block. Michelin instead decided to spend the money on a new factory in North America.
Read more about this topic: Michelin House
Famous quotes containing the words rise, fall and/or house:
“My beloved spake, and said unto me, Rise up, my love, my fair one,
and come away.
For lo, the winter is past, the rain is over and gone;
The flowers appear on the earth; the time of the singing of birds is come, and the voice of the turtle is heard in our land;”
—Bible: Hebrew The Song of Solomon (l. II, 1012)
“We shall walk in velvet shoes:
Wherever we go
Silence will fall like dews
On white silence below.
We shall walk in the snow.”
—Elinor Wylie (18851928)
“A nation grown free in a single day is a child born with the limbs and the vigour of a man, who would take a drawn sword for his rattle, and set the house in a blaze that he might chuckle over the splendour.”
—Sydney Smith (17711845)