MH-1A - Deactivated and Mothballed at James River, 1977

Deactivated and Mothballed At James River, 1977

The MH-1A plant was retired from service in 1976 since the Army Reactor Program had been discontinued, and, as a unique prototype, operation cost for the unit was high. Also, the Panama Canal Company acquired additional land based electrical capacity and in 1976 it was determined that the Sturgis was no longer needed. It operated at an effective annual capacity factor of 0.56 over nine years.

Between December 1976 - January 1977, the power barge was towed back to the United States, sustaining storm-related damage so severe that it had to divert to the Military Ocean Terminal at Sunny Point, North Carolina, and undergo temporary structural repairs. Following repairs, the Sturgis was towed to Fort Belvoir, arriving in March 1977. Fuel was removed from the reactor at Fort Belvoir, shipped to the Savannah River Site, and the plant was put into SAFSTOR (safe storage), with decontamination and physical barriers to prevent release of radioactivity.The Sturgis is now moored in the James River outside Fort Eustis, Virginia and is part of the James River Reserve Fleet.

Read more about this topic:  MH-1A

Famous quotes containing the word james:

    Smitten as we are with the vision of social righteousness, a God indifferent to everything but adulation, and full of partiality for his individual favorites, lacks an essential element of largeness.
    —William James (1842–1910)