Starting in 2009, the Mercedes-Benz Arena will be redeveloped into a football-only stadium. It is planned that new stands will be constructed by the summer of 2011, with pitch level being lowered by 1.30 metres in time for the beginning of the 2009–2010 season. Once all the interior redevelopment is finished, the roof will be expanded to cover new rows of seats. The entire construction is expected to be finished by the end of 2011. The redevelopment was announced along with the stadium's name change in late March 2008. The first computer images of the new arena were released at the same time, also showing a large cube with four video scoreboards above the centre circle, similar to the one in the Commerzbank-Arena in Frankfurt.

Within the first couple of weeks of the redevelopment, 18 undetonated bombs left over from the air raids on Stuttgart during the Second World War were found on the construction site.