Technical Description
The wholepipeline system is 1,115 kilometres (693 mi) long. It comprises two interconnected pipelines—MEGAL Nord and MEGAL Süd. The MEGAL Nord pipeline consists of two parallel pipelines with a length of 459 kilometres (285 mi) and 449 kilometres (279 mi) from Waidhaus to Medelsheim. It is operated at a pressure of 80 bar (1160 psi), which is secured by three compressor stations. The capacity of the pipeline is 22 billion cubic metres (777 billion cubic feet) of natural gas per year, or a little more than 60 million cubic metres (2 billion cubic feet) per day.
The 167-kilometre (104 mi)-long MEGAL Süd pipeline between Oberkappel and Schwandorf is operated at a pressure of 67.5 bar, which is secured by two compressor stations. The connecting pipeline between MEGAL Nord and MEGAL Süd is 40 kilometres (25 mi) long and it is connected in Rothenstadt and Schwandorf.
The MEGAL pipeline crosses the Trans Europa Naturgas Pipeline and the Remich pipeline at Mittelbrunn, the SETG (pipeline from the German-Dutch border) at Gernsheim, and the pipeline going to the Ruhr Industrial Area at Rimpar.
Read more about this topic: MEGAL Pipeline
Famous quotes containing the words technical and/or description:
“When you see something that is technically sweet, you go ahead and do it and you argue about what to do about it only after you have had your technical success. That is the way it was with the atomic bomb.”
—J. Robert Oppenheimer (19041967)
“Once a child has demonstrated his capacity for independent functioning in any area, his lapses into dependent behavior, even though temporary, make the mother feel that she is being taken advantage of....What only yesterday was a description of the childs stage in life has become an indictment, a judgment.”
—Elaine Heffner (20th century)