Upgrades

The need to upgrade the CF-18 was demonstrated during the Gulf War I deployment and during the 1998 Kosovo conflict as advances in technology had rendered some of the avionics on board the CF-18 obsolescent and incompatible with NATO allies. In 2000, CF-18 upgrades became possible when the government increased the defence budget.

In 2001, the Incremental Modernization Project (IMP) was initiated. The project was broken into two phases over a period of eight years and was designed to improve air-to-air and air-to-ground combat capabilities, upgrade sensors and the defensive suite, and replace the datalinks and communications systems on board the CF-18 from the old F/A-18A and F/A-18B standard to the current F/A-18C and D standard. Boeing (merged with McDonnell Douglas) the primary contractor and L-3 Communications the primary subcontractor, was issued a contract for the modernization project starting in 2002. A total of 80 CF-18s, consisting of 62 single-seat and 18 dual-seat models were selected from the fleet for the upgrade program. The project is supposed to extend the life of the CF-18 until around 2017 to 2020.

Incremental Modernization Project Phase I
  • Replacement of the AN/APG-65 radar with the new AN/APG-73 radar, which has triple the processing speed and memory capacity, while also incorporating Terrain Following and Terrain Avoidance modes for low level ground attack missions. Furthermore, the new AN/APG-73 radar is also capable of guiding the modern AIM-120 AMRAAM medium range missile.
  • Addition of the AN/APX-111 Combined Interrogator and Transponder, otherwise known as an IFF (Identification Friend or Foe). The new IFF brings the CF-18 up to current NATO standards for combat identification.
  • Replacement of the radios with the new AN/ARC-210, RT-1556/ARC VHF/UHF Radio. This radio, capable of line-of-sight communications on VHF/UHF frequencies as well as HAVE QUICK, HAVE QUICK II, and SINCGARS waveforms resolved the issues of compatibility with allied forces, and are more resistant to jamming.
  • Replacement of the mission computers with the General Dynamics Advanced Information Systems AN/AYK-14 XN-8 mission computer with increased memory and processing capabilities.
  • Replacement of the Stores Management System with the Smiths Aerospace AN/AYQ-9 Stores Management System. This makes the CF-18 more compatible with the latest of precision guided munitions (PGMs) and furthermore adds the MIL-STD-1760 interface for use of the AIM-120 AMRAAM missile and the JDAM family of GPS-guided bombs.
  • Installation of a Global Positioning System/Inertial Navigation System (GPS/INS) capability, enhancing the CF-18's navigational capabilities.

Within the same time frame, other non-IMP upgrades include:

  • Installation of a new infrared sensor pod.
  • Replacement of the old cathode ray tube cockpit instrument panels with new flat paneled, full colour LCD displays from Litton Systems Canada (now Northrop Grumman Canada).
  • Addition of a new night vision imaging system.
  • Purchase of the AIM-120 AMRAAM medium-range missiles and other advanced air to air and air to ground munitions.
  • Application of a landing gear “get well” program to reduce corrosion and improve gear retraction.
  • Replacement of the existing CF-18 flight simulators with the Advanced Distributed Combat Training System.

The first completed "Phase I" CF-18 was delivered to the Canadian Forces on time in May 2003. Final delivery of all "Phase I" CF-18s was done at a ceremony on 31 August 2006 at L-3 Communications in Mirabel, Quebec.

Incremental Modernization Project Phase II

Phase II of the CF-18 Incremental Modernization Project was awarded to Boeing on 22 February 2005. It consists of the following upgrades:

  • Addition of a Link 16 data net system to the aircraft, enhancing interoperability with major NATO allies.
  • Integration of the Joint Helmet Mounted Cueing System from Boeing, BAE Systems, DRDC and L-3 Communications MAS.
  • Addition of a crash survivable flight data recorder.
  • Upgrade of the electronic warfare suite.

Within the same time frame, other non-IMP upgrades include:

  • A fuselage Centre Barrel Replacement Project (for 40 of the upgraded aircraft).
  • An Air Combat Manoeuvring Instrumentation System.
  • An Integrated Electronic Warfare Support Station.
  • An Electronic Warfare Test Equipment Project.

The first completed "Phase II" CF-18 was delivered to the Canadian Forces on 20 August 2007, at a ceremony in Montreal. The total cost of the entire CF-18 Incremental Modernization Project and concurrent Hornet upgrades was expected to be around C$2.6 billion. The final upgraded aircraft was delivered in March 2010.

The total program cost for the CF-188 purchase and upgrade programs is approximately $20.21 billion including upgrades, in 2011 dollars. Additionally, the cost of maintenance for any 20-year period has been approximately $5 billion, or $250 million per year.

Read more about this topic:  McDonnell Douglas CF-18 Hornet, Development