Markham District High School - Construction

Construction

A new school was built over time on two of the school's fields (front fields, leaving one field at the back), and was planned to open for the 2009/2010 academic year, but due to the students wanting the metal shops to remain in the school, plans have been delayed. They broke ground in early November 2008, and opened the school in time for the 2010/2011 academic year. Currently, the projected number of people for that year is to be 1650, a drop of about 450 students from the 2006/2007 year. This will occur as a result of another high school's (Bur Oak Secondary School) territory overlapping with Markham District's current boundaries.

Read more about this topic:  Markham District High School

Famous quotes containing the word construction:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)