Cost
MHP was constructed at a cost of C$278 m, or $400 per square foot. This would place the cost of the building much higher than local building developers would typically target for a city that is not expanding rapidly. The building was also financed internally, with a target construction payback period of more than 60 years rather than the much shorter typical return projection.
During the initial phase of construction, in 2006, engineers discovered a higher water table than anticipated. As the basement had originally been designed to accommodate numerous mechanical systems, the building underwent substantial redesign, including its foundation. A level of the basement was also eliminated during the redesign.
Read more about this topic: Manitoba Hydro Place
Famous quotes containing the word cost:
“One must always be aware, to noticeeven though the cost of noticing is to become responsible.”
—Thylias Moss, African American poet. As quoted in the Wall Street Journal (May 12, 1994)
“Mining today is an affair of mathematics, of finance, of the latest in engineering skill. Cautious men behind polished desks in San Francisco figure out in advance the amount of metal to a cubic yard, the number of yards washed a day, the cost of each operation. They have no need of grubstakes.”
—Merle Colby, U.S. public relief program (1935-1943)
“It breedeth no small offence and scandal to see and consider upon the one part the curiosity and cost bestowed by all sorts of men upon their private houses; and on the other part the unclean and negligent order and spare keeping of the houses of prayer by permitting open decays and ruins of coverings of walls and windows, and by appointing unmeet and unseemly tables with foul cloths for the communion of the sacrament.”
—Elizabeth I (15331603)