MHP was constructed at a cost of C$278 m, or $400 per square foot. This would place the cost of the building much higher than local building developers would typically target for a city that is not expanding rapidly. The building was also financed internally, with a target construction payback period of more than 60 years rather than the much shorter typical return projection.
During the initial phase of construction, in 2006, engineers discovered a higher water table than anticipated. As the basement had originally been designed to accommodate numerous mechanical systems, the building underwent substantial redesign, including its foundation. A level of the basement was also eliminated during the redesign.
Read more about this topic: Manitoba Hydro Place
Famous quotes containing the word cost:
“Keeping accounts, Sir, is of no use when a man is spending his own money, and has nobody to whom he is to account. You wont eat less beef today, because you have written down what it cost yesterday.”
—Samuel Johnson (17091784)
“If music in general is an imitation of history, opera in particular is an imitation of human willfulness; it is rooted in the fact that we not only have feelings but insist upon having them at whatever cost to ourselves.... The quality common to all the great operatic roles, e.g., Don Giovanni, Norma, Lucia, Tristan, Isolde, Brünnhilde, is that each of them is a passionate and willful state of being. In real life they would all be bores, even Don Giovanni.”
—W.H. (Wystan Hugh)
“Every new stroke of civilization has cost the lives of countless brave men, who have fallen defeated by the dragon, in their efforts to win the apples of the Hesperides, or the fleece of gold. Fallen in their efforts to overcome the old, half sordid savagery of the lower stages of creation, and win the next stage.”
—D.H. (David Herbert)