Manitoba Hydro Place - Cost

Cost

MHP was constructed at a cost of C$278 m, or $400 per square foot. This would place the cost of the building much higher than local building developers would typically target for a city that is not expanding rapidly. The building was also financed internally, with a target construction payback period of more than 60 years rather than the much shorter typical return projection.

During the initial phase of construction, in 2006, engineers discovered a higher water table than anticipated. As the basement had originally been designed to accommodate numerous mechanical systems, the building underwent substantial redesign, including its foundation. A level of the basement was also eliminated during the redesign.

Read more about this topic:  Manitoba Hydro Place

Famous quotes containing the word cost:

    Greeting people doesn’t cost you anything except a roll of your tongue.
    Chinese proverb.

    This people must cease to hold slaves, and to make war on Mexico, though it cost them their existence as a people.
    Henry David Thoreau (1817–1862)

    The cost of a thing is the amount of what I will call life which is required to be exchanged for it, immediately or in the long run.
    Henry David Thoreau (1817–1862)