Cost
MHP was constructed at a cost of C$278 m, or $400 per square foot. This would place the cost of the building much higher than local building developers would typically target for a city that is not expanding rapidly. The building was also financed internally, with a target construction payback period of more than 60 years rather than the much shorter typical return projection.
During the initial phase of construction, in 2006, engineers discovered a higher water table than anticipated. As the basement had originally been designed to accommodate numerous mechanical systems, the building underwent substantial redesign, including its foundation. A level of the basement was also eliminated during the redesign.
Read more about this topic: Manitoba Hydro Place
Famous quotes containing the word cost:
“It is not enough for theory to describe and analyse, it must itself be an event in the universe it describes. In order to do this theory must partake of and become the acceleration of this logic. It must tear itself from all referents and take pride only in the future. Theory must operate on time at the cost of a deliberate distortion of present reality.”
—Jean Baudrillard (b. 1929)
“Apparently, a democracy is a place where numerous elections are held at great cost without issues and with interchangeable candidates.”
—Gore Vidal (b. 1925)
“The cost of a thing is the amount of what I will call life which is required to be exchanged for it, immediately or in the long run.”
—Henry David Thoreau (18171862)