Cost
MHP was constructed at a cost of C$278 m, or $400 per square foot. This would place the cost of the building much higher than local building developers would typically target for a city that is not expanding rapidly. The building was also financed internally, with a target construction payback period of more than 60 years rather than the much shorter typical return projection.
During the initial phase of construction, in 2006, engineers discovered a higher water table than anticipated. As the basement had originally been designed to accommodate numerous mechanical systems, the building underwent substantial redesign, including its foundation. A level of the basement was also eliminated during the redesign.
Read more about this topic: Manitoba Hydro Place
Famous quotes containing the word cost:
“Each is under the most sacred obligation not to squander the material committed to him, not to sap his strength in folly and vice, and to see at the least that he delivers a product worthy the labor and cost which have been expended on him.”
—Anna Julia Cooper (18591964)
“One must always be aware, to noticeeven though the cost of noticing is to become responsible.”
—Thylias Moss, African American poet. As quoted in the Wall Street Journal (May 12, 1994)
“If music in general is an imitation of history, opera in particular is an imitation of human willfulness; it is rooted in the fact that we not only have feelings but insist upon having them at whatever cost to ourselves.... The quality common to all the great operatic roles, e.g., Don Giovanni, Norma, Lucia, Tristan, Isolde, Brünnhilde, is that each of them is a passionate and willful state of being. In real life they would all be bores, even Don Giovanni.”
—W.H. (Wystan Hugh)