Lyme Regis Branch Line - Cannington Viaduct

Cannington Viaduct

Cannington Viaduct is the only significant structure on the branch; it is 203 yards long with ten elliptical arches of 50 feet span, 92 feet high. It was constructed of mass concrete with pre-cast concrete voussoirs; it was one of the earliest major structures of the type in England, and the second highest of the type. Cement was brought to the Cobb harbour at Lyme Regis, and to the construction site by a 1,000 foot cableway. Crushed flint from locally excavated material was used for the aggregate. It was designed by A C Pain and built by Baldry and Yerbergh of Westminster.

During its construction the west abutment and the adjacent pier slipped during the process of tipping fill material behind it, and it and the first pier settled significantly, distorting the first arch crown to rise, delaying the opening. The displaced foundations were stabilised and the third arch was strengthened by means of a diaphragm wall; the distorted first arch was given a brick arch ring. The line of the viaduct parapet shows a very significant drop at this end, but the structure had been stabilised and did not move further.

Read more about this topic:  Lyme Regis Branch Line