Locke Avenue Bridge - Reason For Replacement

Reason For Replacement

Overall condition of the bridge was poor due to incising deterioration of the superstructure and substructure units. Also, the bridge loading capacity was only 5 tons. It was functionally outdated because the substandard deck geometry provided a one-lane roadway width for a two lane traffic pattern. The steel roadway stringers, floor beams and trusses were corroded. It also had severe deterioration of the truss connection plates, and loss of bearing beneath the trusses and the bearing blocks at the pivot pier. Also, the northern and southern approach roadways reduced in width to a single lane upon approaching the bridge. Both northern and southern roadway approaches to the bridge sat on a substandard sag profile which created sight distance for drivers.

A swing bridge was replaced with a girder bridge in 2002. An environmental permit was issued to Hatch Mott MacDonald by New Jersey Department of Transportation to replace the swing bridge.

Read more about this topic:  Locke Avenue Bridge

Famous quotes containing the words reason and/or replacement:

    In history, the moments during which reason and reconciliation prevail are short and fleeting.
    Stefan Zweig (18811942)

    Not even the visionary or mystical experience ever lasts very long. It is for art to capture that experience, to offer it to, in the case of literature, its readers; to be, for a secular, materialist culture, some sort of replacement for what the love of god offers in the world of faith.
    Salman Rushdie (b. 1947)