Loading Arm - Top and Bottom Loading Arm

Top and Bottom Loading Arm

  • General feature of Top and Bottom loading arms

Both types of loading arms are typically made of 3 pipes – respectively called inner arm, outer arm and drop pipe. The size can be from 2” to 6”. These 3 pipes are connected by swivel joints. Swivel joints are required to provide the flexibility needed. The loading arm unfolds to get the required working envelope to load or unload the tanker, and the reverse is to retract or get a minimal space for parking or storage. Both types of loading arms may be mounted on a column or via a plate to an existing wall. Balancing is needed due to the weight of the steel piping. Balancing of the arm is made by counterweight or by a spring balance cylinder.

Read more about this topic:  Loading Arm

Famous quotes containing the words top, bottom, loading and/or arm:

    The necessary has never been man’s top priority. The passionate pursuit of the nonessential and the extravagant is one of the chief traits of human uniqueness. Unlike other forms of life, man’s greatest exertions are made in the pursuit not of necessities but of superfluities.
    Eric Hoffer (1902–1983)

    At the bottom of the heart of every human being, from earliest infancy until the tomb, there is something that goes on indomitably expecting, in the teeth of all experience of crimes committed, suffered, and witnessed, that good and not evil will be done to him. It is this above all that is sacred in every human being.
    Simone Weil (1909–1943)

    Nitrates and phosphates for ammunition. The seeds of war. They’re loading a full cargo of death. And when that ship takes it home, the world will die a little more.
    Earl Felton, and Richard Fleischer. Captain Nemo (James Mason)

    In his tenth July some instinct
    taught him to arm the waiting wave,
    a giant where its mouth hung open.
    He rode on the lip that buoyed him there
    and buckled him under.
    Anne Sexton (1928–1974)