The interconnection will consist:

  • In Lithuania:
    • 53 kilometres (33 mi) double circuit 330 kV line Kruonis–Alytus
    • 1000 MW back-to-back converter in Alytus
    • 48 kilometres (30 mi) double circuit 400 kV line from Alytus to the Lithuania–Poland border
  • In Poland:
    • 106 kilometres (66 mi) double circuit 400 kV line border–Ełk
    • 134 kilometres (83 mi) and 169 kilometres (105 mi) double circuit 400 kV lines Ełk–Narew and Ełk–Matki

According to the pre-feasibility study the cost of interconnection will be €237 million. In addition, Poland will invest €650 million and Lithuania €262 million to upgrade existing energy infrastructure, including Poland–Germany and Poland–Czech Republic upgrades. Lithuania-Poland interconnection has listed as the EU Trans-European Networks project. The interconnection is expected to be operational by 2015.

Read more about this topic:  Lit Pol Link

Famous quotes containing the words technical and/or features:

    In effect, to follow, not to force the public inclination; to give a direction, a form, a technical dress, and a specific sanction, to the general sense of the community, is the true end of legislature.
    Edmund Burke (1729–1797)

    The features of our face are hardly more than gestures which force of habit made permanent. Nature, like the destruction of Pompeii, like the metamorphosis of a nymph into a tree, has arrested us in an accustomed movement.
    Marcel Proust (1871–1922)