List of Space Shuttle Rollbacks

This is a list of space shuttle rollbacks. "Rollback" is the term NASA uses when the space shuttle is rolled back from the launch pad atop the Mobile Launcher Platform and Crawler-transporter to the Vehicle Assembly Building (VAB). A variety of factors can require a rollback, from severe weather to the need for repairs that cannot be performed at the launch pad. Shuttle rollbacks to date are listed in chronological order:

No. Date Orbiter Mission Reason Description
1 1983-10-19 Columbia STS-9 Inspection failure Suspect exhaust nozzle on right solid rocket booster. Columbia was de-stacked and moved back to the Orbiter Processing Facility (OPF).
2 1984-07-11 Discovery STS-41-D Abort Space shuttle main engine (SSME) #3 replaced after a launch abort.
3 1985-03-05 Challenger STS-51-E

STS-51-B

Payload Challenger was rolled back from Pad 39A due to a timing problem with the primary payload, the Tracking and Data Relay Satellite-B (TDRS-B). The vehicle was de-stacked in the VAB and the orbiter returned to Orbiter Processing Facility. The mission, STS-51E, was canceled and the orbiter was re-manifested with 51-B payloads.
4 1990-06-12 Columbia STS-35 Inspection failure A hydrogen leak was detected in External tank (ET) umbilical.
5 1990-08-09 Atlantis STS-38 Fuel leak Atlantis was rolled back after tests confirmed a hydrogen fuel leak on the external tank side of the external tank/orbiter quick-disconnect umbilical.
6 1990-10-09 Columbia STS-35 Weather Weather threat from Tropical Storm Klaus.
7 1991-03-07 Discovery STS-39 Inspection failure Discovery was rolled back to the VAB after significant cracks were found on all four lug hinges on the two external tank umbilical door drive mechanisms.
8 1994-08-24 Endeavour STS-68 Abort Pad abort due to a high discharge temperature in a pump on main engine number three. All three engines were replaced in the VAB.
9 1995-06-08 Discovery STS-70 Inspection failure Yellow Flicker woodpeckers drilled approximately 71 holes on the external tank foam insulation, many of which were too high up on the tank to be accessed at the pad for repairs.
10 1995-08-01 Endeavour STS-69 Weather Endeavour was moved back to the VAB due to threat of severe weather from Hurricane Erin.
11 1996-07-10 Atlantis STS-79 Weather Atlantis was moved back to the VAB due to threat of severe weather from Hurricane Bertha.
12 1996-09-04 Atlantis STS-79 Weather Atlantis was moved back to the VAB due to threat of severe weather from Hurricane Fran.
13 1999-05-16 Discovery STS-96 Inspection failure Discovery was moved back to the VAB to repair hail damage to the external tank foam insulation.
14 2001-01-02 Atlantis STS-98 Crawler failure Atlantis began rollout to Launch Pad 39A, but an hour later stopped on the crawler path so engineers could troubleshoot a failed computer processor on the crawler transporter. Troubleshooting efforts were unsuccessful, the shuttle was returned to the VAB using a secondary computer processor.
15 2001-01-19 Atlantis STS-98 Inspection failure Atlantis was returned to the VAB due to uncertainty involving the integrity of the SRB cables.
16 2005-05-26 Discovery STS-114 Component upgrade Discovery was returned to the VAB in order to get a new, modified external fuel tank in preparation for the first Return to Flight mission following the Columbia accident.
17 2006-08-29 Atlantis STS-115 Weather Atlantis was moved back towards the VAB due to threat of severe weather from Tropical Storm Ernesto. However halfway through rollback, they elected to return Atlantis to the Pad due to improvement in the weather forecast.
18 2007-03-04 Atlantis STS-117 Inspection failure Atlantis was moved back to the VAB after a hail storm damaged the foam insulation on the orbiter's external tank, necessitating repairs. Atlantis was then successfully launched on June 8, 2007.
19 2008-10-20 Atlantis STS-125 Payload Atlantis was moved back to the VAB to allow time to troubleshoot a problem with the Hubble Space Telescope on orbit. Hardware to correct the problem was added to the STS-125 mission payload. Atlantis was then successfully launched on May 11, 2009.
20 2010-12-17 Discovery STS-133 External tank repairs "Discovery" rolled off the launch pad after insulating foam and two structural stringers on the external tank cracked during a launch attempt on November 5, 2010. The repair effort lasted two months as engineers beefed up the structural integrity of the structural members in question and replaced the foam that was removed to facilitate those repairs. The mission lifted off on February 24, 2011. The external tank performed flawlessly during fueling and launch.

Famous quotes containing the words list of, list, space and/or shuttle:

    Thirty—the promise of a decade of loneliness, a thinning list of single men to know, a thinning brief-case of enthusiasm, thinning hair.
    F. Scott Fitzgerald (1896–1940)

    We saw the machinery where murderers are now executed. Seven have been executed. The plan is better than the old one. It is quietly done. Only a few, at the most about thirty or forty, can witness [an execution]. It excites nobody outside of the list permitted to attend. I think the time for capital punishment has passed. I would abolish it. But while it lasts this is the best mode.
    Rutherford Birchard Hayes (1822–1893)

    from above, thin squeaks of radio static,
    The captured fume of space foams in our ears—
    Hart Crane (1899–1932)

    And the shuttle never falters, but to draw an encouraging conclusion
    From this would be considerable, too odd. Why not just
    Breathe in with the courage of each day, recognizing yourself as one
    Who must with difficulty get down from high places?
    John Ashbery (b. 1927)